Skip to content

Diefflen-Nalbach solar park

Inspiration & projects: Diefflen-Nalbach solar park

 

Installed products

Our solutions in use

Our solutions in use – Solar Systems

Solar Systems

Mounting systems for solar parks and PV carports. Economically planned, designed to last and reliably implemented.

MEISER – Viele Stärken. Ein Versprechen. – Ground-Mounted Systems
MEISER – Viele Stärken. Ein Versprechen. – Ground-Mounted Systems

Ground-Mounted Systems

Steel structures for ground-mounted photovoltaic systems, from planning to delivery, all from a single source. Cost-effective, durable and of maximum quality.

MEISER – Viele Stärken. Ein Versprechen. – Solar Systems
Contact person

Contact person

Found inspiration?
If you have any questions or need further information, your contact person from the department will be happy to assist you. Solar Systems.

Suitable for the project

Further references

To all references
MEISER: Pinacotheca
MEISER - Pinacotheca

Pinacotheca

In the Pinakothek in Munich, gratings support safe inspection and service work as an accessible maintenance walkway in the roof area.

MEISER: Paulaner
MEISER - Paulaner

Paulaner

At Paulaner, accessible walkways were implemented in the floor area with non-slip metal flooring.

MEISER: Illanz bridge
MEISER - Illanz bridge

Illanz bridge

At the Illanz bridge, open driving and walking surfaces support safe operation on the outdoor crossing.

MEISER: CTLES Paris
MEISER - CTLES Paris

CTLES Paris

At CTLES Paris, open walkways and maintenance areas support safe operation in the technical interior areas between the archive modules.

MEISER: Dresden city cable car
MEISER - Dresden city cable car

Dresden city cable car

Accessible walkways with GRP gratings were installed along the tracks of the Dresden funicular for maintenance and operation.

MEISER: Rheinau jetty
MEISER - Rheinau jetty

Rheinau jetty

At the Rheinau jetty, walkable dock areas along the berths are being fitted with MEISER GRP gratings as walkways.

MEISER: Berlin Castle
MEISER - Berlin Castle

Berlin Castle

In Berlin Palace, open maintenance and service areas support safe operation within the dome structure.

MEISER: BMW Dingolfing
MEISER - BMW Dingolfing

BMW Dingolfing

In the BMW Dingolfing project, accessible walking and working areas along the production and conveyor technology were implemented in the production hall.

MEISER: IKEA Vienna
MEISER - IKEA Vienna

IKEA Vienna

In the Ikea Vienna project, external levels and entrances were implemented on the open façade structure over several storeys.

MEISER: Ranshofen substation
MEISER - Ranshofen substation

Ranshofen substation

At the Ranshofen substation, sheet metal profile gratings are used as accessible maintenance and work surfaces in the technical equipment area.

MEISER: Jade Weserport Wilhelmshaven consortium
MEISER - Jade Weserport Wilhelmshaven consortium

Jade Weserport Wilhelmshaven consortium

In the Jade Weserport joint venture project in Wilhelmshaven, maintenance walkways in the technical area were implemented with GRP gratings as accessible walking zones.

MEISER: German Hygiene Museum
MEISER - German Hygiene Museum

German Hygiene Museum

In the Deutsches Hygiene-Museum, grid elements were integrated as permeable ceiling cladding above the stage and structure the event hall.

MEISER: Olenex Brake
MEISER - Olenex Brake

Olenex Brake

At Olenex in Brake, an accessible plant level with gratings was implemented as a walking and maintenance area for safe access to the containers.

MEISER: Green It-Cube Darmstadt
MEISER - Green It-Cube Darmstadt

Green It-Cube Darmstadt

Accessible maintenance and access areas were implemented in the "Green IT Cube Darmstadt" in order to safely guide routes in the technical interior area.

MEISER: Freiham geothermal power plant
MEISER - Freiham geothermal power plant

Freiham geothermal power plant

At the geothermal power plant in Freiham, maintenance and operating platforms in the technical area were equipped with walk-on grating surfaces.

MEISER: Kaufbeuren ice rink
MEISER - Kaufbeuren ice rink

Kaufbeuren ice rink

In the Kaufbeuren ice stadium, open ceiling surfaces structure the hall construction and enclose technical zones above the playing field.

MEISER: Lesumhafen
MEISER - Lesumhafen

Lesumhafen

In the Lesumhafen project, MEISER GRP gratings are used as walk-on flooring on a jetty between the berths.

MEISER: Heinsfeld Castle Museum
MEISER - Heinsfeld Castle Museum

Heinsfeld Castle Museum

At Heinsfeld Castle Museum, full gratings were integrated into the historic wall situation as walk-on flooring in front of the arched openings.

MEISER: Technology Center Potsdam
MEISER - Technology Center Potsdam

Technology Center Potsdam

At the Potsdam Technology Center, stairs and access areas in the outdoor area were covered with grating for safe paths.

MEISER: Niederfinow boat lift
MEISER - Niederfinow boat lift

Niederfinow boat lift

At the Niederfinow boat lift, open maintenance and walkways support the safe operation of the exterior and interior areas of the facility.

MEISER: Ski jump Eisenerz
MEISER - Ski jump Eisenerz

Ski jump Eisenerz

At the Eisenerz ski jump, open platform surfaces create a slip-resistant maintenance and work zone in the outdoor area.

MEISER: Observation tower Gobelwarte Grein
MEISER - Observation tower Gobelwarte Grein

Observation tower Gobelwarte Grein

At the Gobelwarte observation tower in Grein, the platform and staircase were fitted with grating coverings for safe, accessible surfaces in the steel structure.

MEISER: Leoben State Hospital
MEISER - Leoben State Hospital

Leoben State Hospital

At Leoben State Hospital, open walkways and maintenance areas support the safe operation of the rooftop helicopter platform in an exposed location.

MEISER: Potato trade Weeze
MEISER - Potato trade Weeze

Potato trade Weeze

At Kartoffelhandel Weeze, a central walkway between the conveyor lines was implemented to provide safe access for operation and inspection.

MEISER: Treetop Walk Steigerwald Ebrach
MEISER - Treetop Walk Steigerwald Ebrach

Treetop Walk Steigerwald Ebrach

At the Steigerwald treetop walk in Ebrach, gratings act as walk-on viewing windows to complement the path and recreation area and provide a view downwards.

MEISER: TreeTopWalk Edersee
MEISER - TreeTopWalk Edersee

TreeTopWalk Edersee

On the TreeTopWalk Edersee, open surfaces support safe operation on the viewing platform and along the treetop path.

MEISER: Serengeti Park
MEISER - Serengeti Park

Serengeti Park

In the Serengeti Park, profiled metal gratings are used as walk-on flooring on a visitor path or panorama trail.

MEISER: Lübars solar park
MEISER - Lübars solar park

Lübars solar park

MEISER supplied the substructure for the photovoltaic system for the Lübars solar park in Saxony-Anhalt. The project makes an important contribution to sustainable power generation and land use.

MEISER: Biggeblick Attendorn
MEISER - Biggeblick Attendorn

Biggeblick Attendorn

At Biggeblick Attendorn, open walking and recreational areas support the safe operation of the viewing platform in an exposed location.

MEISER: Jetty GJ Tolkamer
MEISER - Jetty GJ Tolkamer

Jetty GJ Tolkamer

At the GJ Tolkamer jetty, open jetty areas create a continuous walking zone up to the mooring platform above the water.

MEISER: Denios AG Bad Oeynhausen
MEISER - Denios AG Bad Oeynhausen

Denios AG Bad Oeynhausen

At Denios AG in Bad Oeynhausen, open walkways and shelving areas support safe operation in modular container systems.

MEISER: Stone slab Waidring
MEISER - Stone slab Waidring

Stone slab Waidring

In the Steinplatte Waidring project, gratings were used as walkable surfaces on a viewing platform on the rock.

MEISER: Keolis train wash system
MEISER - Keolis train wash system

Keolis train wash system

In the Keolis train wash, continuous maintenance and walking areas along the washing line were implemented with GRP grating as flooring.

MEISER: Märker Cement Harburg
MEISER - Märker Cement Harburg

Märker Cement Harburg

At Märker Zement, the transition walkway and plant platform were equipped with walk-on surfaces made of gratings and paving slabs for safe paths along the technology.

MEISER: Stuttgart 21 station
MEISER - Stuttgart 21 station

Stuttgart 21 station

At Stuttgart 21 station, large, permeable surfaces support the safe operation and ventilation of the parking levels.

MEISER: Rügen Bridge Stralsund
MEISER - Rügen Bridge Stralsund

Rügen Bridge Stralsund

In the Rügen Bridge in Stralsund, a continuous maintenance walkway was implemented in the interior of the structure with accessible grating surfaces.

MEISER: People’s shipyard
MEISER - People’s shipyard

People’s shipyard

In the Volkswerft project, GRP systems were implemented as accessible work and maintenance areas in a waste water tank.

MEISER: Atlantic Sail City
MEISER - Atlantic Sail City

Atlantic Sail City

At Atlantic Sail City, raised outdoor platforms with walk-on floor coverings were implemented and secured by railings and balustrades.

MEISER: Wolkenburg bridge
MEISER - Wolkenburg bridge

Wolkenburg bridge

At the Wolkenburg bridge, open walkway surfaces create a sure-footed connection along the rising bridge.

MEISER: Parking deck Marburg
MEISER - Parking deck Marburg

Parking deck Marburg

On the parking deck in Marburg, ramp areas and railing zones were designed with lattice elements that clearly structure the spiral-shaped construction.

MEISER: Eccentric house Bochum
MEISER - Eccentric house Bochum

Eccentric house Bochum

At the Exzenterhaus Bochum, full gratings were used as walk-on surfaces and blend in with the surrounding design of the building envelope.

MEISER: Poststadion Berlin
MEISER - Poststadion Berlin

Poststadion Berlin

In the Poststadion Berlin, grandstand areas were equipped with anti-slip tread and walking zones for safe paths between the rows of seats.

MEISER: Terex
MEISER - Terex

Terex

At Terex, sheet metal profile gratings are used as walk-on steps and walkways on crane and steel structures.

MEISER: Letschin solar park
MEISER - Letschin solar park

Letschin solar park

MEISER supplied the substructure for the photovoltaic system for the Letschin solar park in Brandenburg. The project is one of the largest solar park projects in Energiekontor's history.

MEISER: Grindelwald First
MEISER - Grindelwald First

Grindelwald First

For the "First View" viewing platform on Grindelwald First, load-bearing and accessible surfaces were integrated into the striking steel structure at an altitude of around 2,200 meters.

MEISER: National Museum Doha
MEISER - National Museum Doha

National Museum Doha

In the National Museum Doha, open presentation areas divide the walking and standing zones around the exhibition vehicle.

MEISER: Morsum train station
MEISER - Morsum train station

Morsum train station

At Morsum station, anti-slip platform surfaces divide the waiting and walking areas along the edge of the track.

MEISER: Knorr Bremse Munich
MEISER - Knorr Bremse Munich

Knorr Bremse Munich

At Knorr Bremse Munich, open façade surfaces structure the building envelope and frame the window strips as an upstream level.

MEISER: Main bridge Haßloch
MEISER - Main bridge Haßloch

Main bridge Haßloch

At the Mainbrücke Haßloch bridge, open maintenance and access areas support safe operation along the track system in the outdoor area.

MEISER: Gammertingen solar park
MEISER - Gammertingen solar park

Gammertingen solar park

MEISER supplied the substructure for the photovoltaic system for the Gammertingen solar park in Baden-Württemberg. The project combines solar energy and battery storage for sustainable power generation.

MEISER: De Walvis Amsterdam
MEISER - De Walvis Amsterdam

De Walvis Amsterdam

In the De Walvis project in Amsterdam, façade and ceiling areas were implemented with lattice elements that characterize the architecture and incorporate the outdoor areas.

MEISER: Silicon Products Group
MEISER - Silicon Products Group

Silicon Products Group

At Silicon Products Group, maintenance platforms and walkways in the industrial plant were equipped with walk-on grating surfaces.

MEISER: Van Volxem Wiltingen
MEISER - Van Volxem Wiltingen

Van Volxem Wiltingen

At Van Volxem in Wiltingen, a flush-fitted grating surface was integrated into the courtyard design as a functional cover.

MEISER: Resin tower
MEISER - Resin tower

Resin tower

At the Harz Tower, sheet metal profile gratings as step and platform coverings support visitor guidance over several levels.

MEISER: Hanse House Oberleichtersbach
MEISER - Hanse House Oberleichtersbach

Hanse House Oberleichtersbach

At Hanse-Haus in Oberleichtersbach, gratings are used as accessible walking, working and maintenance surfaces in the hall and production area.

MEISER: Clinic Bad Colberg
MEISER - Clinic Bad Colberg

Clinic Bad Colberg

At the Bad Colberg clinic, open escape and maintenance areas create clear access points along the external staircase.

MEISER: Opera de Vichy
MEISER - Opera de Vichy

Opera de Vichy

At the opera house in Vichy, open terrace areas support safe operation in the entrance area at the square in front.

MEISER: Vivantes Archive
MEISER - Vivantes Archive

Vivantes Archive

In the Vivantes archive, accessible walkways and floor areas were implemented to provide safe access between the shelving systems.

MEISER: Bosch parking garage
MEISER - Bosch parking garage

Bosch parking garage

In the Bosch multi-storey parking lot, walk-on surfaces in the parking area were covered with profiled sheet metal grating for permanent operation.

MEISER: Stadtilm quarry
MEISER - Stadtilm quarry

Stadtilm quarry

In the Stadtilm quarry, sheet metal profile gratings create safe walking and maintenance surfaces along an elevated conveyor and transition structure.

MEISER: Audi Neckarsulm
MEISER - Audi Neckarsulm

Audi Neckarsulm

Accessible work and maintenance areas were implemented at the Audi plant in Neckarsulm to provide safe access to production and service areas.

MEISER: Norisring Nuremberg
MEISER - Norisring Nuremberg

Norisring Nuremberg

At the Norisring Nuremberg, open stand and running zones support safe operation in the outdoor event and exhibition area.

MEISER: Institute of Inorganic Chemistry Erlangenrg
MEISER - Institute of Inorganic Chemistry Erlangenrg

Institute of Inorganic Chemistry Erlangenrg

At the Institute of Inorganic Chemistry in Erlangen, open balconies and façade surfaces structure the corner of the building and frame the ribbon windows along the floors.

MEISER: Leuna resins
MEISER - Leuna resins

Leuna resins

At Leuna Harze, open service and maintenance areas create clear walking zones along the industrial plant.

MEISER: Ratsgymnasium Peine
MEISER - Ratsgymnasium Peine

Ratsgymnasium Peine

At Ratsgymnasium Peine, an external walkway was installed along the façade with non-slip flooring for safe access to the doors.

MEISER: Sylt car train
MEISER - Sylt car train

Sylt car train

On the Sylt car train, open driving and walking zones create a continuous route between the railings in the outdoor area.

MEISER: Ammersee-Gymnasium Dießen
MEISER - Ammersee-Gymnasium Dießen

Ammersee-Gymnasium Dießen

At Ammersee-Gymnasium in Dießen, outdoor areas and steel construction elements were finished with grating to give paths and façade areas a clear structure.

MEISER: Administration building Schwaben Netz Kaufbeuren
MEISER - Administration building Schwaben Netz Kaufbeuren

Administration building Schwaben Netz Kaufbeuren

At the Schwaben Netz Kaufbeuren administration building, open façade surfaces support safe operation and enclose the circular building envelope as a protective level in front of it.

MEISER: Klagenfurt ice rink
MEISER - Klagenfurt ice rink

Klagenfurt ice rink

In the Klagenfurt ice rink, sheet metal profile gratings support visitor guidance in the grandstand areas as step and platform coverings.

MEISER: Losheim office building
MEISER - Losheim office building

Losheim office building

For the office building in Niederlosheim, a continuous ceiling cladding was realized throughout the entire complex and supplemented by solutions for floor areas and walkways.

Let’s talk about
what you have in mind.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.